What made this collaboration successful for both sides was the fact that we were aligned from start to finish, working toward a common goal without disputes over who would achieve better margins.
Présentation :
Hyperion, the owner of these projects, has been a reference in the renewable energy sector since 2006, with a strong track record in developing solar projects. Hyperion has already developed more than 640 MW of solar energy in the Iberian Peninsula, being one of the main contributors to its implementation in Portugal, and is now also dedicated to developing technologies such as storage batteries, hydrogen, and wind energy.
The projects in Estremoz and Alcochete stand out for their use of advanced technological solutions, such as the Green Container, a solution from Omexom Portugal, which reduces diesel consumption by up to 90% during construction, and drones supported by artificial intelligence to optimize construction management and monitoring. Additionally, they use bifacial photovoltaic modules, which ensure superior performance in solar energy production, along with single-axis trackers and string inverters. These advanced technologies guarantee greater efficiency and sustainability in energy generation.


